mountainecho.com

July 23, 2012

Water District to do $120,000 Study

Filed under: Uncategorized — waltblog @ 4:47 pm

BURNEY – The three directors present at the Burney Water District monthly board meeting July 19, discussed and approved a proposal by Pace Engineering to prepare a water and sewer master plan and do a rate study for the district.
The last master plan was completed in 1979 and written during a time when the economy was good, there was an expanding population and business community. The entire picture changed, along with the economy. There was a dramatic decline in population and the business community has declined significantly since that time.
In offering their services, PACE Engineering pointed out that they have a 30-year relationship with the district and have assisted the district with a number of system improvements, prepared a number of engineering reports as well as assisting with the 2005 Water Capacity Charge.

No Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.

Powered by WordPress